5 months of attachment

Monday, August 07, 2006

103th day of attachment

In the morning, I did preventive maintenance for the Thoraric Drainage aspirator and ear thermometer as they are due since last month. After that, i continue editting my final report before letting my supervisor to read through it.

In the afternoon, I done a bit of repair since my colleague is on leave. I repaired a intermittent suction regulator and analyze the problem with the alternating mattress pump cotrol from betabed. After that, i was being assigned a task which involved in checking of devices required for the marathon event, Philips Singapore Cup (11-13 August) . However, I only managed to complete the checking and preventive maintenance for transport physiologic monitor, Propaq 202EL.

0 Comments:

Post a Comment

<< Home